📞 0339-0387701 (WhatsApp) Contact

« Back to Software Engineering (NCCIA)

What is a baseline SRS?

A. An SRS with no requirements in it
B. An early draft that anyone may change freely
C. A copy of the SRS stored on a developer's laptop
D. A version of the SRS formally approved and placed under change control ✅

Correct Answer: D. A version of the SRS formally approved and placed under change control

Explanation

  • Once baselined, changes go through formal change control
  • The baseline is the reference for design and testing.