« Back to Software Engineering (NCCIA)
What does the change control process ensure?
Correct Answer: B. That changes are evaluated, authorised, implemented and verified in a controlled way
« Back to Software Engineering (NCCIA)
Correct Answer: B. That changes are evaluated, authorised, implemented and verified in a controlled way