Maths MCQs MCQs
1194 MCQs is category mein available hain.
All MCQs in Maths MCQs
791 The smallest 4-digit number using 0, 3, 5, and 8, is?
A
3508
B
3058
C
0358
D
None of these
Explanation
Given Four digits are 0,3,5,8 To write the smallest 4-digit numbers using the above digits, we must arrange them in ascending order. Here, we get 0358 = 358 [It has only 3 digits ] 3058 Therefore, The smallest 4-digit number using 0,3,5,8 is 3058 .
Last verified on 17-11-2026
792 If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days?
A
7
B
3
C
5
D
None of these
Explanation
7 spiders make 7 webs in 7 days. This means 1 spider makes 1 web in 7 days.
Last verified on 17-11-2026
793 In a dairy farm, 40 cows eat 40 bags of husk in 40 days, in how many days one cow will eat one bag of husk?
A
10 days
B
20 days
C
30 days
D
40 days
Explanation
Days in which 40 cows eat 40 bags of husk = 40 days Days in which 1 cow eat 40 bags of husk = 40 * 40 days Days in which 1 cow eat 1 bag of husk = (40 * 40) / 40 bags In a dairy form 40 cows eat 40 bags of husk in 40 days, In 40 days one cow will eat one bag of husk
Last verified on 17-11-2026
794 A fort had provision of food for 150 men for 45 days. After 10 days, 25 men left the fort. The number of days for which the remaining food will last, is?
A
29
B
37
C
42
D
54
Explanation
After 10 days: 150 men had food for 35 days. Suppose 125 men had food for x days. Now, Less men, More days (Indirect Proportion) 125 : 150 :: 35 : x 125 x x = 150 x 35 x = 150 x 35 125 x = 42 .
Last verified on 17-11-2026
795 What is the prime factorization of 16?
A
2 × 4 × 2
B
2 × 2 × 2 × 2
C
4 × 4
D
1 × 16
Explanation
The factors of 16 are 1, 2, 4, 8, and 16, and the prime factorization of 16 is 16 = 2 × 2 × 2 × 2.
Last verified on 16-11-2026
796 250 men can finish a work in 20 days working 5 hours a day. To finish the work within 10 days working 8 hours a day, the minimum number of men required is ______?
A
300
B
310
C
312
D
313
Explanation
Let's calculate the total work hours: 250 men * 20 days * 5 hours/day = 25,000 man-hours To finish the work in 10 days working 8 hours a day: Let x be the number of men required: x men * 10 days * 8 hours/day = 25,000 man-hours (to complete the same amount of work) x * 80 = 25,000 x = 25,000 / 80 x = 312.5 (313)
Last verified on 16-11-2026
797 What is a formula of perimeter of rectangle?
A
2 (length + width)
B
2 (length × width)
C
Length + width
D
None of these
Explanation
The perimeter of a rectangle is the total distance around it. Formula: Perimeter = 2 × (Length + Width).
Last verified on 16-11-2026
798 The angle of elevation of the sun, when the length of the shadow of a tree is equal to the height of the tree is?
A
45 degree
B
30 degree
C
75 degree
D
60 degree
Last verified on 16-11-2026
799 1.14 expressed as a percent of 1.9 is?
A
60%
B
6%
C
10%
D
None of these
Explanation
To find the percentage, divide 1.14 by 1.9 and multiply by 100: (1.14 ÷ 1.9) x 100 = 60%
Last verified on 16-11-2026
800 Sum of the interior angles of a polygon = _____?
A
270 (n - 2)
B
180 (n - 2)
C
360 (n - 2)
D
90 (n - 2)
Explanation
The formula for the sum of interior angles of a polygon with n sides is 180(n - 2) . It comes from dividing the polygon into (n - 2) triangles, each having 180° total .
Last verified on 16-11-2026