« Back to Software Engineering (NCCIA)
Which of the following is the best time to validate requirements?
Correct Answer: C. As soon as they are drafted, before design and coding begin, and again after changes
« Back to Software Engineering (NCCIA)
Correct Answer: C. As soon as they are drafted, before design and coding begin, and again after changes