Which comes first in a typical project: verification of the design, or validation of the finished system?

A. Validation of the finished system comes first
B. Verification of the design comes first, since it happens during development before final validation ✅
C. Neither happens
D. Both happen at exactly the same time

Correct Answer: B. Verification of the design comes first, since it happens during development before final validation

Explanation

Design is verified as it is produced, while the finished system is validated later against user needs.