📞 0339-0387701 (WhatsApp) Contact

« Back to Software Engineering (NCCIA)

Which approach to integration testing starts with the top-level module and uses stubs for lower modules?

A. Acceptance testing
B. Bottom-up integration
C. Big-bang integration
D. Top-down integration ✅

Correct Answer: D. Top-down integration

Explanation

Top-down integration tests the main control module first, using stubs to stand in for subordinate modules.