📞 0339-0387701 (WhatsApp) Contact

« Back to Pak Study

Khojak pass connects ________?

A. Qila Abdullah with Zhob
B. Qila Abdullah with Chaman ✅
C. Qila Abdullah with Qilla Saifullah
D. None of these

Correct Answer: B. Qila Abdullah with Chaman

Explanation

  • Khojak Pass connects Qila Abdullah with Chaman
  • The construction started in 1888
  • The construction was completed in 1891
  • It was once the 4th-longest tunne l in the world
  • Khojak Tunnel
  • The location
  • Balochistan
  • The length
  • 3.9 KM
  • longest Railway Tunnel of
  • Pakistan
  • known as
  • Shela Bagh Tunnel
  • located near the city of
  • West of Quetta