A V-model project finds a design defect during integration testing. Which phase should be revisited?

A. Deployment
B. Coding only, never design
C. Architectural design, to which integration testing is traced ✅
D. Requirements only, never design

Correct Answer: C. Architectural design, to which integration testing is traced

Explanation

Traceability in the V-model links each test level to its development counterpart, guiding the fix upstream.