1081 Which pair comes next in the following series? A, Z, B, Y, _____, _____?
A
V, Z
B
C, X
C
Y, S
D
None of these
Last verified on 15-11-2026
1082 A man is 24 years older than his son. In two years, his age will be twice the age of his son. The percentage age of his son is?
A
14 years
B
22 years
C
28 years
D
None of these
Explanation
Let the age of the man be x Then the age of his son becomes (x−24) 2 years later from now, The age of man will be = x+2 and age of his son will be =(x−24+2)=x−22 According to the question, 2(x−22)=x+2 i.e., 2x−44=x+2 i.e., x=46 Therefore, The present age of man=46 years And present age of his son = is 46−24 = 22 years ND29-5-2023
Last verified on 15-11-2026
1083 A sum of money at simple interest amounts to Rs. 815 in 3 years and to Rs. 854 in 4 years. The sum is _____?
A
Rs. 650
B
Rs. 698
C
Rs. 690
D
Rs. 700
Explanation
S.I. for 1 year = Rs. (854 - 815) = Rs. 39. S.I. for 3 years = Rs. (39 x 3) = Rs. 117. Therefore Principal = Rs. (815 - 117) = Rs. 698 .
Last verified on 15-11-2026
1084 Solve √1.44
A
1.9
B
3.2
C
1.9
D
1.2
Explanation
. The square root of 1.44 can be written as (1.44)1/2. So (1.44)1/2 = (1.2 × 1.2)1/2 (1.44)1/2 = [(1.2)2]1/2 (1.44)1/2 = (1.2)2/2 (1.44)1/2 = (1.2)1 Thus, √1.44 = 1.2
Last verified on 15-11-2026
1085 If 18 men can eat 20 kg of rice in 3 days how long with 6 men take to eat 40 kg of rice?
A
20 days
B
18 days
C
16 days
D
14 days
Explanation
Solution-1 6 men 3 times as long to eat 20 that is equals 9 days and multiply that number by 2 Answer: 18 days Solution-2 20/18=1.11 kg per day for 18 men 1.11/3=.37037 each man each day 40/6=6.67 kg per day for 6 men 6.67/x=.37037 x = 18 days
Last verified on 15-11-2026
1086 The length and breadth of rectangle are in the ratio 3:1. If the breadth in 7 cm , then the length of rectangle is?
A
14
B
18
C
21
D
18
Explanation
Let the Breadth be = x then length be = 3x Given: Breadth is 7cm If x = 7 cm Then, 3x = 3(7) = 21cm
Last verified on 15-11-2026
1087 Twelve children take sixteen days to complete a work which can be completed by eight adults in twelve days. Sixteen adults started working and after three days, ten adults left and four children joined them. How many days will they take to complete the remaining work?
A
3 days
B
5 days
C
6 days
D
9 days
Explanation
Work done by 12 children in 16 days = 1 (full work) Work done by 1 child in 16 days = 1/12 Work done by 1 child in 1 day = 1/(12 × 16) = 1/192 Work done by 8 adults in 12 days = 1 Work done by 1 adult in 12 days = 1/8 Work done by 1 adult in 1 day = 1/(8 × 12) = 1/96 Work done by 16 adults in 3 days = 16 × 3 × (1/96) = 1/2 Remaining work = 1 - 1/2 = 1/2 Now, 6 adults and 4 children work together: Work done by 6 adults in 1 day = 6 × 1/96 = 6/96 = 1/16 Work done by 4 children in 1 day = 4 × 1/192 = 4/192 = 1/48 Total work done per day = (1/16 + 1/48) = (3 + 1)/48 = 4/48 = 1/12 Days required = (1/2) ÷ (1/12) = 6 days
Last verified on 15-11-2026
1088 Find the average of 8,13,25,43 and 11
A
20
B
33
C
27
D
22
Explanation
Given numbers: 8, 13, 25, 43, 11 Step 1: Add the numbers 8 + 13 + 25 + 43 + 11 = 100 Step 2: Divide by the number of values 100 ÷ 5 = 20
Last verified on 15-11-2026
1089 Complete the series: 2, 6,18, 54, _____?
A
108
B
162
C
148
D
218
Last verified on 15-11-2026
1090 The value of 1/3 of 24 is?
A
4
B
6
C
8
D
12
Explanation
Value = 1/3 of 24 = 1/3 x 24 = 8
Last verified on 15-11-2026